![]() Homemade scarfing jig for the circular saw. |
![]() side view |
![]() end of blade extends above bottom of jig |
![]() in action |
![]() view from top (plywood already cut) |
![]() The results. Two 5/32" plywood pieces cut at once |
![]() Floor framing. Rear piece is 3/4"x6" poplar. Rest is 3/4"x3" & 3/4" x1.5" poplar. |
![]() Floor framing is glued to bottom plywood panel with Titebond II wood glue. Clamped (temporarily) with screws |
![]() Floor framing showing front box. |
iDetail of pocket holes made with a Kreg pocket hole jig. |
![]() 3/4" Styrofoam insulation lightly sanded and fitted in place. See the footwell framing in the middle. |
![]() Styrofoam was cut very accurately and easily with an Xacto knife |
![]() footwell is fabricated out of 16 ga. steel powder-coated to match frame and fenders |
![]() footwell detail. footwell opening is 50.75"x29.75" |
![]() footwell detail. footwell opening is 50.75"x29.75" |
![]() Floor framing with footwell temporarily inserted |
iinsulation and inner plywood panel have not been epoxied yet |
i |
![]() front of trailer |
![]() axle mounting brackets |
![]() floor mounting tabs |
![]() Floor overhangs chassis by 1.25" on each side. Clearance of 1/2" between each axle trailing arm and the trailer side |
![]() rear view of floor & chassis |
![]() fender |